A standby generator headed to a data center site is an oversize open-deck load with a delivery window tied to a crane and a commissioning schedule. The move goes smoothly when the details are settled before the truck is booked, not on delivery morning. This guide covers what to have ready, how the trailer is chosen, and what a good broker handles for you.

What to have ready before you call

Five pieces of information let our team scope the move and quote it quickly.

  • Dimensions and weight of the generator and its enclosure, from the manufacturer's shipping drawing if you have it

  • Pickup address, contact, and how the unit will be loaded (crane, forklift, or factory dock)

  • Delivery site address or coordinates, the gate contact, and badging or escort rules

  • The crane window at the site and who is coordinating it

  • Whether the unit ships with the sub-base tank and enclosure installed, or separately

How the trailer is chosen

Enclosed standby generators in the 500 kW to 2 MW range are usually too tall for a flatbed once the enclosure is on. A step deck drops the deck height and keeps the load under the legal 13 feet 6 inches in most states. Taller units, or units shipped on a sub-base fuel tank, move on a double drop or an RGN so the load rides low enough to avoid route restrictions.

Weight decides the rest. As a rough guide, heavy units in the range of 45,000 pounds or more often need overweight permits, and sometimes a multi-axle trailer to spread the weight. Whether a load needs a permit depends on the actual gross weight and axle weights of the loaded truck and the rules of each state on the route, not on the generator's weight alone. Where permits are needed, they are pulled for every state on the route, and escort requirements follow the dimensions.

Oversize wheel loader chained down on a removable gooseneck trailer, riding low for route clearance
An oversize machine on an RGN. Generators shipped on a sub-base fuel tank ride the same way, low enough to clear route restrictions.

What the broker handles

On a generator move, our team confirms the loading method at the factory, pulls the permits, arranges escorts if the dimensions require them, and confirms the site's crane window and gate contact before delivery. We agree on the updates you need, from pickup through delivery.

Frequently asked questions

How far ahead should a generator move be booked?

A week or more for permitted loads, because permit turnaround varies by state. Legal-dimension units on a step deck can often book within a few days.

Can the generator be delivered to a secured site?

Yes. We collect badging and gate requirements when the load is booked, brief the driver, and confirm arrival with the site ahead of time so the truck is expected.

Have a generator or switchgear delivery coming up? Our team can scope it from the model number and the site address.

Planning a shipment like this?

Talk to the Bikeman team.

A straight answer on equipment, lead time, and what it takes. No form letter.

Zach Clark

CEO & Co-Founder, Bikeman Transport

  • Generators
  • Permits
  • Step deck
Share