Skip to main content
Bikeman Transport

Industries

Data Center & Digital Infrastructure Logistics

Generators, switchgear, racks, and cooling equipment need a plan that fits the site schedule. We coordinate equipment, access, and delivery details for data center builds and retrofits nationwide.

Enclosed standby generator chained to a trailer at the gate of a data center construction site, crane staged nearby

What goes wrong

The problems these projects cannot afford.

  • Delivery windows tied to cranes and crews

    A generator that arrives Thursday when the crane was booked Wednesday costs more than the freight did. Dates on these projects are commitments, not estimates.

  • Sensitive electrical gear

    Switchgear, UPS cabinets, and PDUs do not tolerate shock, tipping, or weather. The wrong trailer or a rushed securement job shows up as a claim and a delay.

  • Secured, active construction sites

    Badging, gate hours, laydown limits, and a dozen other trades sharing the road. A driver who does not know the site rules stalls everyone.

  • Many vendors, one schedule

    Equipment ships from different factories on different timelines. Without someone watching the whole picture, the site finds out about a gap when a truck does not show.

What we move

Freight we handle for this industry.

  • Standby generators and enclosures
  • Switchgear, PDUs, and RPPs
  • UPS systems and battery cabinets
  • CRAC and CRAH units, chillers, and cooling towers
  • Server racks, cabinets, and pre-populated racks
  • Transformers and busway
  • Cable reels and containment
  • Prefabricated electrical and mechanical modules

How we support you

What working with Bikeman looks like.

  • Equipment matched to the load

    Step deck or RGN for generators and chillers, multi-axle RGN for the heaviest cabinets and generator sets, air-ride van for racks and UPS gear, and Conestoga when it needs weather protection and side loading. Permits arranged for anything over legal size.

  • Site coordination before dispatch

    We confirm the gate, the contact, badging, crane or forklift availability, and the delivery window with the site before the truck rolls, and we brief the driver.

  • A clear contact across the program

    For builds and retrofits, our team sequences every load against your schedule and tells you early when a vendor is going to miss.

  • Updates before you ask

    Pickup confirmation with photos when requested, in-transit check-ins, and an ETA the site can plan around. If the plan changes, you hear it from us first.

FAQ

Questions we hear most

Can you deliver to a secured site with badging requirements?

Yes. We collect the site's access requirements, gate hours, and contact when the load is booked, brief the driver, and confirm arrival with the site ahead of time so the truck is expected at the gate.

How do you protect switchgear and UPS units in transit?

Air-ride equipment, securement planned for the piece rather than generic strapping, weather protection where the freight is not rated for exposure, and photos at pickup so condition is documented. Anything tall, heavy, or top-heavy goes on the trailer type that keeps it low and stable.

Do you handle a whole build or single loads?

Both. A single generator move gets the same process as a program. For builds and retrofits with many loads, our team coordinates the schedule across every vendor and shipment, with a clear contact for your site.

Next step

Talk to an expert about data center & digital infrastructure freight

Tell us what is moving, where the site is, and when the crew needs it. Our team will follow up with questions and a plan for the move.

(651) 300-3722

Monday to Friday, 7:00 AM to 5:00 PM Central. After-hours coverage for active shipments.