Skip to main content
Bikeman Transport

Services

Open Deck & Heavy Haul Transport

Open deck freight rides on flatbed, step deck, double drop, or RGN trailers because it is too tall, wide, heavy, or awkward for a van. Heavy haul adds permits, escorts, and route planning for loads over legal dimensions or weight, and it is where equipment choice and communication matter most.

Common use cases: data center builds and retrofits, energy and utility projects, industrial machinery moves, and construction materials.

Wheel loader chained down on a removable gooseneck (RGN) trailer behind a red semi at sunset

When to use it

When open deck & heavy haul is the right call

  • Machinery, generators, transformers, and equipment loaded by crane or forklift from the side or top
  • Freight taller or wider than 8 feet 6 inches, or longer than a standard trailer allows
  • Pieces over roughly 45,000 pounds, or over legal length
  • Steel, precast, pipe, and site materials that need tarping or specific securement

What we handle

What Bikeman takes care of

  • Flatbed, step deck, double drop, RGN, extendable and multi-axle RGN, lowboy, Conestoga, and step deck Conestoga trailers
  • Loaders, skid steers, excavators, dozers, telehandlers, rock crushers, mining equipment, compactors, and modular buildings
  • Oversize and overweight permits in every state on the route
  • Pilot cars and escorts when dimensions require them
  • Chains, straps, and dunnage matched to the freight, with tarping requirements confirmed during quoting
  • Route surveys for height, weight, and bridge restrictions
  • Crane and rigging coordination with your site at both ends

Process

How an open deck or heavy haul shipment runs with Bikeman

  1. Step 1

    Scope

    Cargo, dimensions, weight, site access, dates, and who needs updates. We ask the questions that prevent a surprise on delivery day.

  2. Step 2

    Carrier assignment

    Equipment matched to the freight. Permits and escorts arranged where needed, and tarping requirements confirmed during quoting. You get the carrier and driver details before pickup.

  3. Step 3

    In transit

    Check-ins at the milestones that matter to your schedule. Issues flagged early with a plan, not after the window closes.

  4. Step 4

    Delivery and paperwork

    Site contact confirmed ahead of arrival. Signed proof of delivery, photos when requested, and clean invoicing.

FAQ

Questions we hear most

When does a load need permits?

In most states, when the loaded trailer exceeds 8 feet 6 inches wide, 13 feet 6 inches tall, 80,000 pounds gross, or standard length. Requirements vary by state and route; we check every state the load crosses and arrange the permits and escorts before pickup.

How far ahead should heavy haul be booked?

For permitted loads, a week or more is comfortable because permit turnaround varies by state. Legal-dimension flatbed and step-deck loads book in days. Tell us the dimensions and weight early and we will tell you how much lead time the route really needs.

Who is responsible for loading and securement?

The shipper loads, the driver secures, and we confirm both before the truck leaves. We tell you what the driver will need on site (crane, forklift, rigging) and what the driver brings (chains, straps, tarps), so nobody is waiting on the other.

Next step

Talk to an expert about open deck & heavy haul

Tell us what is moving, where, and when. Our team will follow up with the equipment, the lead time, and a straight answer on what it takes.

(651) 300-3722

Monday to Friday, 7:00 AM to 5:00 PM Central. After-hours coverage for active shipments.